Grid operator not required to connect data center to congested power grid

A Dutch court ruled on Wednesday that grid operator TenneT is not required to provide an immediate power connection to a large data center in an area with an overloaded grid. The ruling establishes that the developer, Australian firm Goodman, must wait until capacity becomes available before receiving a connection.