Power grid in part of Utrecht province at capacity: no new connections from July 1

Starting July 1st, new power grid connections in parts of the Utrecht province will be halted due to network congestion, placing even residential requests on a waiting list. While this connection stop has been implemented in specific areas, it has been temporarily averted in Flevopolder, Gelderland, and eastern Utrecht.
Based on reporting by nu. Translated and condensed by LocalHeadlines.



